Can't make the foundation for a 3-storey garage with a steel frame? There are many cases where the construction site has a ready-made concrete foundation, the investor often asks if the contractor can't do the foundation? Usually the answer is no and if the garage has a floor, almost certainly no one chooses the no-pedicure option because it is too risky. If there is a column, then there must be a foundation, that is the safest solution. However, if the existing concrete base is thick, has a high reinforcement content and the geology there is good, we can calculate that there is no need to do the foundation, or pour an additional layer of concrete and have some new reinforcement. It is absolutely not possible to make a foundation for a garage that can go up to 3 floors if the structure is calculated methodically and scientifically. Welcoming and highly appreciating that investors are interested in the field of airport operation and together with ACV proposed this project, Deputy Minister Pham Quy Tieu emphasized that this is an urgent project, because of the situation of the airport's parking lot. Tan Son Nhat International Airport is currently congested, so the Deputy Minister suggested that the project should be accelerated. In terms of architecture, the Deputy Minister agreed on the plan of location, land, and scale of the garage; However, the Deputy Minister noted that the garage architecture must be studied and designed in harmony with the station; traffic connection must be reasonable, there should be no traffic intersection above the port; must harmonize the interior and exterior architecture of the Garage; at the same time, there must be a reasonable plan to ensure construction and traffic safety.xaydungnhadephcm “Currently, there are investors (Corporation 319, Ministry of Defense) interested and proposed to participate in the project. Through the process of surveying the current status, passenger traffic, vehicles, site planning and activities of Tan Son Nhat Airport, the Investor has proposed to the Investor (Vietnam Airport Corporation). Nam), the Investor has researched, reviewed and basically agreed with the investor's policy, "- Mr. Hung said. According to Mr. Phan Phu - Deputy General Director of Corporation 319 (Ministry of Defense), in the order of the proposed construction project of Tan Son Nhat International Airport Garage, Corporation 319 researched in the direction of The idea of ​​the Government agency, but the list has not been announced, so the Investor considers this as a self-proposal of the Project, including determining the investment scale, total investment and financial plan.